Facility Planning

In December 2016 the MSD of New Durham Township Board of Education entered into a contract to review all district facilities. The purpose of this review was to determine the current status of the buildings, review possible projects to expand or improve services for our students, and ensure the long term fitness of our structures. Information presented by the architectual firm doing the audit and by the financial firm coordinating financing can be found below.

 

Architectual Firm - Viridian Architectual Design Inc.

New Durham Township Westville Schools Facility Assessment Report Proposal

April 10, 2017 School Board Presentation 

Complete Report

1. Introduction - Table of Contents - Definitions and Symbols (File

2. Preschool (File)

3. Exterior Campus Conditions (File)

4. Interior Campus Conditions (File)

5. Elementary (File)

6. Middle School (File)

7. High School (File)

8. Auxillary Areas - Educational (File)

9. Auxillary Areas - Recreational (File)

10. Mechanical, Electrical and Plumbing (File)

11. Roof Systems (File)

12. Campus Exterior (File)

13. Asbestos Report (File)

14. Probable Cost Estimate (File)

 

Project Summary Presentation - April 26, 2017

 

Finacial Firm - Umbaugh and Associates

 April 19, 2016 Meeting Taxing Impact Presentation

 

Individual Viridian Quotes

May 10, 2017

- Time and Material (Small Projects)

- Site Improvement (Drainage)

- Kitchen and Cafeteria 

 

Solar Project

Solar Project Presenation/Proposed Plan

Examples of School Solar Installations